We have a link! Now time for OS installations, configurations, migrations and all that fun stuff. The most difficult part logistically is behind so now it should be smooth sailing. image
Power is connected. Took freaking long as there was some difficulties (ground cables are pain to connect to splitter boxes). Now time for network image
Today's objective. Connect power and network to the rack. image
Now the worst task of it all. Covering the trench that was dug last year, so very compress with lots of stones. That was a mistake.... Give me ๐Ÿ’ช or cold glass of wine image
Cables pulled between house and the shed (not connected yet though). Time to finish building up a rack. Cabinet is has been assembled some weeks ago. Now time for power image
All the hardware for new backup setup has arrived and we have finally some colder day today. Perfect to lay down power and connectivity cables. image
โ˜• image
We are bringing the services back now.
โ˜• Good morning everyone! We are having some hardware issue with one of our servers (file server) which caused some of the services to go down. We are working on a fix atm.
# ๐Ÿ”ง Maintenance window - #76 Here's short summary of the updates we have done today during our [monthly deployments](). This month we've been one week late but hope to be more on time next month : - **Lemmy** () - Update to version 0.19.11 - Mostly bug fixes. - More details [here]() and [here]() - **Cryptpad** () - Updated to version 2025.3.1 - More details [here]() - **Etherpad** (https://pads.disroot.org) - Set back the ep_delafter_delay module so that untouched pads are automatically removed - **Movim** () - Updated to version 0.31 - More details [here]() - **LibreTranslate** () - Updated to version 1.6.5 - More details [here]()